List of Major Completed Projects
|
S. No
|
Name of the work
|
Segment
|
% in JV/individual
|
Value of Contract Rs. In Lakhs
|
Value of Contract Rs. In Lakhs
|
|---|---|---|---|---|---|
|
1
|
APWSIP- Rehabilation and modernisation from Km0.00 to Km 29.291 of Nagarjunasagar LalBahadur canal, A.P, India.
|
Irrigation
|
98%
|
20,967.62
|
2016
|
|
2
|
Rehabilitation and Modernization of Structures and laying Steel Fibre Reinforced Shotcreting (SFRS) from Km. 90.540 to Km. 180.000 of Nagarjunasagar Lal Bahadur Canal, T.S., India.
|
Irrigation
|
100
|
16,877.45
|
2017
|
|
3
|
Rehabilitation and Upgradation of NH- 221 (New 30) from Km. 71+200 to Km. 121+000 (AP/Telangana Border to Rudrampur Section) in the state of Telangana to two lane with shoulder.
|
Roads
|
49%
|
18,119.00
|
2018
|
|
4
|
Design, supply, errection, testing and commisioning of electro mechanical works with SCADA & Instrumentation along with associated substation and switch gear including all connected aceesories for various pumping stations located at various places in Adilabad, Nizamabad & Karimnagar Dist including defects liability period and operation and maintenance for 10 years [Package No.III)
|
Electro Mechanical works
|
100%
|
23,204.61
|
2019
|
|
5
|
Design, supply, errection, testing and commisioning of electro mechanical works with SCADA & Instrumentation along with associated substation and switch gear including all connected accessories for various pumping stations located at various places in Nalgonda & Medak Districts including, defects liability period and operation and maintenance for 10 years [Package No.IV).”
|
Electro Mechanical works
|
100%
|
12,455.89
|
2019
|
|
6
|
Construction of Dindi Balancing Reservoir of AMRSLBC Tunnel Scheme across Dindi River near Mothia Thanda of Teldevarapalli (V), Chandampet (M), Nalgonda Dist. ( Raghava Share 49%)
|
Irrigation (Dam)
|
49%
|
53,749.01
|
2020
|
|
7
|
KTPS Stage—VII (1x800MW) Thermal Power Transmission Scheme -Construction of 400Kv sub station at Jangoan, 2 Nos. 400 kV Quad Bay Extensions Juluruadu SS and 400 kV Jangaon - Tippapur.
|
Electrical work
|
49%
|
28,898.00
|
2020
|
|
8
|
Major Irrigation - Adilabad District - Lower Penganga Project - Excavation and lining of Main Canal from Km 47.000 to Km. 89.09 including Construction of Structures.
|
Irrigation
|
74%
|
20,877.04
|
2022
|
|
9
|
"Construction of 24 Nos. Major Bridges & 01 No. Viaduct 17/24.4 composite girder between Ch. 40000 m to Ch. 78000 m (excluding Ch. 51251 m to Ch.60351 m) of Wardha -Nanded Section."
|
Railway
|
49%
|
11,378.78
|
2022
|
|
10
|
Kaleshwaram Project- Formation of Sri Komaravelli Mallanna Sagar reservoir with a capacity of 50 TMC Formation of Earth Bund with all its associated components.
|
Irrigation
|
51%
|
2,41,107.00
|
2023
|
|
11
|
TSGENCO – YTPS (5X800MW) – Construction of Raw Water Reservoir at (5x800MW) Yadaadri Thermal Power Station Veerlapalem (V), Dameracherla (M), Nalgonda Dist.
|
Raw Water Reservior
|
90%
|
9,048.74
|
2023
|