1
APWSIP- Rehabilation and modernisation from Km0.00 to Km 29.291 of Nagarjunasagar LalBahadur canal, A.P, India.
Irrigation
98%
20,967.62
2016
2
Rehabilitation and Modernization of Structures and laying Steel Fibre Reinforced Shotcreting (SFRS) from Km. 90.540 to Km. 180.000 of Nagarjunasagar Lal Bahadur Canal, T.S., India.
Irrigation
100
16,877.45
2017
3
Rehabilitation and Upgradation of NH- 221 (New 30) from Km. 71+200 to Km. 121+000 (AP/Telangana Border to Rudrampur Section) in the state of Telangana to two lane with shoulder.
Roads
49%
18,119.00
2018
4
Design, supply, errection, testing and commisioning of electro mechanical works with SCADA & Instrumentation along with associated substation and switch gear including all connected aceesories for various pumping stations located at various places in Adilabad, Nizamabad & Karimnagar Dist including defects liability period and operation and maintenance for 10 years [Package No.III)
Electro Mechanical works
100%
23,204.61
2019
5
Design, supply, errection, testing and commisioning of electro mechanical works with SCADA & Instrumentation along with associated substation and switch gear including all connected accessories for various pumping stations located at various places in Nalgonda & Medak Districts including, defects liability period and operation and maintenance for 10 years [Package No.IV).”
Electro Mechanical works
100%
12,455.89
2019
6
Construction of Dindi Balancing Reservoir of AMRSLBC Tunnel Scheme across Dindi River near Mothia Thanda of Teldevarapalli (V), Chandampet (M), Nalgonda Dist. ( Raghava Share 49%)
Irrigation (Dam)
49%
53,749.01
2020
7
KTPS Stage—VII (1x800MW) Thermal Power Transmission Scheme -Construction of 400Kv sub station at Jangoan, 2 Nos. 400 kV Quad Bay Extensions Juluruadu SS and 400 kV Jangaon - Tippapur.
Electrical work
49%
28,898.00
2020
8
Major Irrigation - Adilabad District - Lower Penganga Project - Excavation and lining of Main Canal from Km 47.000 to Km. 89.09 including Construction of Structures.
Irrigation
74%
20,877.04
2022
9
"Construction of 24 Nos. Major Bridges & 01 No. Viaduct 17/24.4 composite girder between Ch. 40000 m to Ch. 78000 m (excluding Ch. 51251 m to Ch.60351 m) of Wardha -Nanded Section."
Railway
49%
11,378.78
2022
10
Kaleshwaram Project- Formation of Sri Komaravelli Mallanna Sagar reservoir with a capacity of 50 TMC Formation of Earth Bund with all its associated components.
Irrigation
51%
2,41,107.00
2023
11
TSGENCO – YTPS (5X800MW) – Construction of Raw Water Reservoir at (5x800MW) Yadaadri Thermal Power Station Veerlapalem (V), Dameracherla (M), Nalgonda Dist.
Raw Water Reservior
90%
9,048.74
2023